Secure Your Solar Project Before December 31st — Lock In 35–40% Incentives Today

Ir directamente a la información del producto
1 de 6

Boston Solutions

Energy, Automation and Consulting Deposit

Energy, Automation and Consulting Deposit

Serious about working with us?

Reserve Your Project Spot with a $5,000 Deposit

If you're serious about finding solutions to your problems. Our creative team of engineers and consultants are just a couple clicks away. We require a $5,000 deposit to secure your place in our project queue. This amount will be 100% applied toward the scope of work for your project or system design.

Why do we require this?

Demand for residential and commercial services is at an all-time high — especially with the global push for EVs, and Data Centers electrification. We’re prioritizing clients who are ready to take action now and want to be fully installed, interconnected and powered on. 

What Your Deposit Guarantees:

  • A dedicated project engineer and support team assigned to your home, facility or business needs.
  • A priority slot in our design + permitting queue — we can only take on a limited number of projects per year.
  • Application of your deposit toward any system (solar, battery, EV, generator, full microgrid, consulting, construction, integration, automation, etc).

Deposits help ensure that we’re focusing on serving those most committed to finding solutions this year. 

*Service timelines may vary as some factor are outside of our control like - utility interconnection approvals*

Precio habitual $5,000.00
Precio habitual Precio de oferta $5,000.00
Oferta Agotado
Los gastos de envío se calculan en la pantalla de pago.
Ver todos los detalles

FAQ Section

Q: Is this deposit refundable?
A: Yes, if we determine the project isn’t viable or if timelines don’t match your goals, the deposit is 100% refundable.

Q: What if I change my mind?
A: Your deposit is will be valid for 12 months and can be transferred to any project within your household or commercial properties.

Q: Is $5,000 the full cost?
A: No. This is an initial deposit to begin engineering and lock incentives. Final cost depends on system size, equipment, and rebates.